Skip to content

Power System S822LC (8335-GTA) EOL and EOSL dates

End of life, end of sale, and end of support (end of service life) dates for the IBM Power System S822LC (8335-GTA).

IBM·Power Systems·ServerSupport endedVerified

The IBM Power System S822LC (8335-GTA) reaches its last date of support on March 31, 2024.

Source: IBM end-of-life notice. Verified November 11, 2026.

Key dates

End of SaleLast day the OEM accepts new orders.
2017-05-26
10 years ago
End of SW MaintenanceLast day bug fix and maintenance releases are published.
Not published
No date
End of SupportLast day of OEM technical support and security fixes.
2024-03-31
3 years ago
Last Date of Support (EOSL)Final day any OEM contract can be used.
2024-03-31
3 years ago

Source: OEM end-of-life notice · Verified 2026-11-11

IBM machine type-model 8335-GTA. IBM product lifecycle list: withdrawn from marketing (EOM) 2017-05-26, end of service (EOS) 2024-03-31. Announcements 917-065 and 922-117. Per-model pages: https://www.ibm.com/support/pages/lifecycle/

See something wrong? Submit a correction.

Platform lifecycle context

Generation
POWER8

What are my options

Extend with the OEM

Available until the last date of support, usually at a stepped-up post-EOS price. Best where you need current firmware, security patches, or a support-gated software entitlement.

Move to third-party maintenance

Parts and engineering coverage from an independent provider, often for less than the post-end-of-support OEM renewal. Best for stable, feature-complete platforms.

Replace

Refresh onto current-generation hardware. Compare the multi-year support saving from extending against the capital and migration cost of replacement.

Decommission via ITAD

Retire the asset with NIST 800-88 data erasure, chain of custody, and certificates of destruction. Resellable units can offset the project cost.

Coverage levels

24x7, 4-hour response
A technician or replacement part is committed to arrive within four hours, at any hour, on any day.
Next business day
The part or technician arrives on the next business day after the case is logged.
8x5 business hours
Response during standard business hours on business days only.
Parts only
The provider ships the replacement part and your own team installs it.

4-hour coverage depends on spare parts being stocked near your site, and it is usually priced above next business day. 4-hour vs next business day support

Want to test a renewal number? Use the calculator with your own OEM quote.

Frequently asked

When does IBM Power System S822LC (8335-GTA) support end?
OEM support for the Power System S822LC (8335-GTA) is listed as ending March 31, 2024, with a last date of support of March 31, 2024. Verify against the OEM notice for your exact part number before budgeting.
Can I still run the Power System S822LC (8335-GTA) after end of support?
Yes. The hardware does not stop working. You can keep it in production with third-party maintenance covering parts and engineering support, often for less than the post-end-of-support OEM renewal.
What are my options for the Power System S822LC (8335-GTA)?
Four: extend with the OEM while it is still offered, move to third-party maintenance, replace with current-generation hardware, or decommission through a certified ITAD process with data destruction certificates.
What SLA should I get for the Power System S822LC (8335-GTA) after end of support?
Match the SLA to the role. Choose 4-hour response for production and customer-facing roles, where an outage stops work. Next business day usually fits redundant units and lab gear. Either way, confirm in writing which depot serves your location and that it stocks parts for the Power System S822LC (8335-GTA).
Is the Power System S822LC (8335-GTA) still supported for security patches?
Security fixes generally stop at the end-of-support date, which is usually the date that drives compliance decisions. After that, compensating controls such as network segmentation are typically required.

Related Power Systems models